Black Friday · A whole year. Half the price. Ends in 2d 20h Get the deal

Product updates

Bill part of a time entry.

3 min read

Six hours went into the homepage. Four of them are worth billing this month: the other two were a layout you threw away, or work the client already paid for, or simply the next invoice’s. Until now you had two bad choices: bill all six, or edit the entry down to four and lose the hours you really worked. Now you type the hours you’ll bill and say where the rest goes.

Invoice time for Halfmoon Bakery's Website refresh: three entries ticked; Homepage layout's hours read 4h, and beside them 2h later, with a menu
Type 4 into the homepage’s 6 hours. The other 2 wait for the next invoice.

Type the Hours You’ll Bill

In Invoice time, tick an entry and its hours become a field. Click them and type fewer: 4, 4:30 or .5, the way you log time. The entry keeps its 6 hours as worked; the invoice bills 4, at the rate the entry was logged at, and the total under the list follows. Type all 6, or more, and the entry bills whole again.

Say Where the Rest Goes

The hours you don’t bill appear beside the ones you do, already answered. Bill later keeps them waiting in Invoice time for the next invoice. Don’t charge keeps them as worked, in your reports and the person’s week, and never offers them to bill again.

The rest's menu open under 2h later: Bill later, waits in Invoice time; Don't charge, never billed, still counted as worked
Two answers for the rest, and the choice is yours each time.

Nothing changes until you choose Create draft. Close Invoice time halfway and every entry is still whole.

On a Draft, the Line Is Its Time

A draft’s time line adds up the entries behind it. Click its hours and Time on this line lists each entry in the same field. Bill fewer hours of one, change the rest from Bill later to Don’t charge, or type the hours back to bill the rest too. Update line changes the quantity and the total together, with one Undo.

Time on this line, on a draft invoice: Homepage layout billing 4h, its other 2h marked not charged, and Update line
The line’s hours open the entries behind them.

A typed quantity can no longer quietly bill less while the whole entry counts as invoiced. That gap is where cut hours used to disappear.

Your Team Sees One Entry

The person who logged the time still sees one entry of 6 hours, tagged with where each part went: 4h · In draft and 2h · Unbilled. Nobody has to explain why their week shrank.

The Time page's list: Homepage layout for Halfmoon Bakery, tagged 4h In draft on INV-1046 and 2h Unbilled
One entry, two places, the same 6 hours.

Every Hour Ends in One Place

Each hour worked is on an invoice, unbilled, not charged or non-billable, and the parts of an entry always add up to what was logged. Delete the draft and the parts become one entry again. Undo the draft right after making it and even the hours you didn’t charge come back. Once an invoice is sent its hours are fixed: correct the amount with a credit note, or void the invoice and its time is ready to bill again.

Moving from Harvest? Time it rounded down for billing now comes across as the rounded hours, ready to bill, and the rest not charged. See how a Harvest move works.

What It Doesn’t Do

It never bills more than was worked: a minimum charge is a line of its own. There are no rounding rules, so you decide each time what an entry bills. The Time to invoice guide walks through every step.

Related reading

4 min read

How to invoice for hours worked

Five hours logged, four and a half to bill. Follow a packaging job from dated time entries to a $570 invoice the client can check.

3 min read

How to calculate billable hours

From hours and minutes to a clear charge: the calculation, the common mistakes and the checks before you invoice.

3 min read

Time Tracking That Catches the Hours You Miss

Hours recalled on Friday are a guess. Log time in one line, see the stretches you missed, and carry every billable hour to a draft invoice.

Full-size screenshotScroll to explore